Saturday, February 23, 2008

Stage one, a connection trial, is almost ready to start. Two sites are being prepared to allow trialling of two possible types of transmission between each other a) Wireless and b) ADSL. The CPE aerials have been installed, Cisco routers configured and currently, some fibre optic cabling is being laid.